Electrical Engineering
E-1 : Recommended Values of Illuminance as NBC of India 2016 E-2 : Power consumption and running time for electrical equipment as per Reliance E-3 : Road Lighting Recommendations (Trade Practice) E-4 : Lighting Density as per ECBC 2017 E-5 : Cable Selection Chart E-6 : Transformer and Motor Efficiencies E-7 : Salient Feature of ECBC-2017 E-8 : Environmental Protection Category as per IEC E-9 : Design Considerations : Life Period of Electrical Items as per DMRC E-10 : Electrical Load of Medical Equipment in a Trauma Hospital E-11 : Voltage Drop in Wires upto 70 Sq. mm.
HVAC
HVAC 1 : Out Door Design Data. HVAC 2 : Outside Design Conditions for Summer Months. HVAC 3 : Solar Heat gain through ordinary glass: w/m2 for 100 N . North Latitude. HVAC 4 : Typical Fresh Air Requirements HVAC 5 : Effect of shading upon instantaneous solar heat gain through single thickness of common Window Glass. HVAC 6 : Properties of air at Different Temperature HVAC 7 : Hot Water Consumption HVAC 8 : Duct Selection HVAC 9 : Metabolic Rates HVAC 10 : Equivalent Temperature Differential for Walls (Degree celsius) HVAC 11 : Equivalent Temperature Differentials (DEGC) for Dark Coloured Sunlit and Shaded Roofs. HVAC 12 : Infiltration through Doors- Crack Method HVAC 13 : Approximate Heat Gain from Occupants in Air Conditioned Spaces. HVAC 14 : Properties of Refrigerants HVAC 15 : Appliance Heat gain HVAC 16 : Minimum Exhaust Air Requirements/Room Pressure HVAC 17 : Occupancy load (Watts) HVAC 18 : Minimum Exhaust Air Requirements/Room Pressure HVAC 19 : The amount of vapor - kg per cubic meter - in humid air. HVAC 20 : Check Figures for Cooling Estimates. HVAC 21 : Recommended Relative Humidity HVAC 22 : Solar heat gain through glass for 200 N. HVAC 23 : Noise Level Recoomendations as per dept of Veterans Washington HVAC 24 : Infilteration through cracksaround windows cmm/m of crack HVAC 25 : Airconditioning Parameters as per CPWD
Miscelaneous Services
M-1 : NSR Rates 2007 Lifts M-2 : NSR Rates 2007 Lifts M-3 : Occupancy M-4 : Water Requirement